There has been work done externally and internally. A wooden framework, about the size of a bus shelter, has appeared in the grounds. The half barrel planters were lifted off what I assume is the septic tank, or maybe just a drains tank and the concrete lid opened up. The planters are now back. As of this Monday all the external seats were still piled up at the edge of the patio.
While it did not look tired last time I was in it, it's not exactly built from brick excrement house materials, so perhaps it needed more than just a face lift to reopen.
Nothing on their web page
https://lordoftheisles.co.uk Their FaceBook page says opening end of May, so it must be very soon. A water shortage risk at Craobh apparently.