Connel Bridge reduced clearance
Connel Bridge reduced clearance
Work on Connel Bridge will reduce clearance to 13m for 6 months starting September. They ask you to give them a ring if your air draft is over 10m http://whamassoc.org.uk/news/connel-bri ... ruary-2020
Re: Connel Bridge reduced clearance
It seems September was optimistic but there are signs today that work is about to start. I wonder if the finish date will be put back 2 months too.
Derek
Derek